The Malaysia Shell MLNG Tiga project
Control and Monitoring features for all circuit breakers, transformers and generators from 33 kV down to 415 V are the base of the Advant EMS system which is completed with overall functionality such as Dynamic Fast Load Shedding, Active and Reactive Power Control, Load Sharing, Frequency and Voltage Control, and Overall Synchronisation.
The Malaysia LNG complex is located in Sarawak, Malaysia. When completed, the plant will make the Bintulu facility the world's single largest LNG complex with a combined production capacity of about 23 million tonnes per annum. Malaysia LNG Tiga is a joint venture of Petroleum National Bhd (Petronas), Shell gas B.V., Nippon Oil LNG (Netherlands) B.V. and Sarawak State of Malaysia.
For details of the project visit the Petronas site. http://www.petronas.com
After the successful commissioning of the Advant EMS system in world's largest refinery, the Jamnagar refinery of Reliance in India, the MLNG Tiga project reconfirms the unquestionable leadership of ABB in this type of applications.