Case Study | February 3, 2011
Case History No: R4044 Chevron Pascagoula
Source: CTI IndustriesFull length pitting/wall thinning/erosion mostly confined to the bottom two rows on both banks of the twelve heat exchangers.
Full length pitting/wall thinning/erosion mostly confined to the bottom two rows on both banks of the twelve heat exchangers.