Coal Ash Pond Polishing Filter System
The power plant’s wastewater is contaminated by coal ash generated from power plant operations and removed in the scrubber system. The wastewater is sent to a settling pond after polymer injection to allow for sedimentation. The wastewater then travels to a second, third and fourth pond for additional settling. The water is pumped at a maximum flow rate of 10,000 GPM.