Lessons Learned With A Partial LPFW Re-Sleeving - Ameren

Source: CTI Industries

This paper references slide 12 of the slide presentation for explaining further the Ameren “5%-Rule” expected remaining service life criteria evaluation for the AmerenUE Labadie unit 4, 5A LP feedwater heater.

A practical industry operating record criteria is proposed as a general guideline as to when to plan scheduling the re-sleeving of cuprous alloy tubed feedwater heaters, both high-pressure and low-pressure.

With longer time spans between major generating unit outages to plan a re-bundling, time-to-failure for a heat exchanger with advanced pluggage may not time well with those opportunities. So a predictive tube-failure rate model of remaining service life becomes invaluable; for instance, as to when to take a Spring mini-outage for interim measures such as a low-cost re-sleeving to avert larger losses. In the case of the Labadie 4-5A LPFWH, an avoided additional -16mw de-rate which otherwise may have occurred by Sept. 16, 2009. The 4-5A’s re-sleeving decision was enacted by March of 2009, and in-service by June of 2009. Sleeve delivery was about 8 weeks.

access the Application Note!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Hydrocarbon Online? Subscribe today.

Subscribe to Hydrocarbon Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Hydrocarbon Online