Case Study

Removing Hexavalent Chromium From Groundwater Supplies

Removing Hexavalent Chromium From Groundwater Supplies

The chromium removal pilot study was conducted for the County of San Bernardino, CA at their CSA 70 Zone J - Well 5 treatment facility. Chromium in the CSA 70 Zone J – Well 5 raw water source exceeds the current Maximum Contaminant Levels (MCL).

The results of this study show very successful removal of hexavalent chromium contaminant from the well water on a continuous basis for water treatment to laboratory non-detection levels, well below the proposed SWRCB - DDW lower limit MCL.

VIEW THE CASE STUDY!
Signing up provides unlimited access to:
Signing up provides unlimited access to:
  • Trend and Leadership Articles
  • Case Studies
  • Extensive Product Database
  • Premium Content
HELLO. PLEASE LOG IN. X

Not yet a member of Hydrocarbon Online? Register today.

ACCOUNT SIGN UP X
Please fill in your account details
Login Information
I'm interested in newsletter subscriptions.
ACCOUNT SIGN UP

Subscriptions

Sign up for the newsletter that brings you the industry's latest news, technologies, trends and products.

You might also want to:

WRT - Water Remediation Technology